Bahrain Embarks on Innovative Solution: Concreting Drains to Revolutionize F1 2024’s Inaugural Race

Bahrain Embarks on Innovative Solution: Concreting Drains to Revolutionize F1 2024’s Inaugural Race

P1racenews AI automatic summary:


Filling Bahrain drains with concrete being considered for F1 2024’s first race

The three-day test at the Sakhir International Circuit has been interrupted twice due to a loose drain cover at Turn 11. The new ground-effect machines’ aerodynamics are causing strain on the drains and concrete surroundings when passing over them due to their power. The specific racing line at Bahrain’s Turn 11 requires drivers to run over the drains before sweeping into the corner. Issues with the drain cover caused delays after incidents involving Charles Leclerc, Lewis Hamilton, and Sergio Perez, leading to repair delays and altered schedules. Concerns are now raised regarding potential interruptions during the upcoming race weekend, prompting solutions such as filling drains with concrete to prevent further issues. The FIA is actively assessing the situation to ensure the safety and efficiency of the circuit for future events.

Tovább a cikkhez

Related posts